PT. ROBERTS SCHAEFER SOROS INDONESIA (USD 313,214.00)
- Supply Material For Job 1007 (USD 97,294.00)
- Counter Weight Detail (USD 28,240.00)
- Truck Pad Steel (USD 31,510.00)
- Surge Bin Reinforcement (USD 4,700.00)
- Fabrication for Panel 6 & 7 (USD 151,470.00)
WILMAR GROUP (IDR 14,375,228,000.00)
- Pipe Rack Refinery Tank (IDR 337,136,000.00)
- NPK 3 (IDR 14,038,092,000.00)
PT. BATUTUA TEMBAGA RAYA (IDR 5,050,828,000.00)
- Wetar Project - UDP Restart (IDR 1,365,000,000.00)
- Wetar Preliminary Steel & Copper Busbar (IDR 204,403,000.00)
- Wetar - 850 KL Tank (IDR 2,362,920,000.00)
- Wetar Mechanical MTO (IDR 503,470,000.00)
- Hydraulic Manual Valve (IDR 12,230,000.00)
- Installation Cost 850 KL Tank (IDR 602,805,000.00)
PT. PETROSEA (IDR 4,335,445,400.00)
- ABN Workshop Extension Facilities
PT. DWINAD NUSA SEJAHTERA (IDR 2,306,440,699.00)
- Tembang Gold Project – Structural & Mechanical Works (IDR 12,328,173,750.00)
- Concrete Works (IDR 2,028,831,000.00)
- Tembang Gold Project – Package II (IDR 10,311,488,000.00)
- Tembang Gold Project – Elution & Acid Wash Column (IDR 1,405,239,000.00)
- Tembang Gold Project – Package III
- Repair Lime Mixing Tank (IDR 25,215,400.00)
PT. SORINI (IDR 1,816,785,000.00)
- Fructose Project Sorini
- Circulation Tank
- Additional Civil Fructose
- Maldex Food Safety Project
- Bug Project
.