| 1 |
PT. Adaro Indonesia |
2023 |
Pengadaan Batu Bidur/ Batu Ballast Timbangan @ 5 ton |
706,543,000.00 |
| 2 |
PT. Maruwai Coal |
2023 |
Pekerjaan Fabrikasi Plant Feed Bin Linner |
355,600,000.00 |
| 3 |
PT. ALP Petro Industry |
2023 |
Pekerjaan Renovasi Gudang Rungkut |
1,483,195,000.00 |
| 4 |
PT. Leewon Industrial |
2023 |
Pekerjaan Jasa Bending Rolling WF |
199,807,000.00 |
| 5 |
PT. ALP Petro Industry |
2023 |
Pek. Interior Work di |
3,419,168,393.00 |
| 6 |
PT. Adaro Mineral Indonesia |
2023 |
PCC Dismantle Stage 2 Project |
89,199,924,444.00 |
| 7 |
PT. GLOBAL AMINES INDONESIA |
2022 |
FABRICATION AND INSTALLATION OF DUCTING AND PLATFORM IN TOH BURNER |
200,000,000.00 |
| 8 |
METALCOM INFRASTRUKTURA |
2022 |
MULTI LANE FREE FLOW TOLL (MLFF) |
879,867,000,000.00 |
| 9 |
PT. CIPTA BAJA REKAYASA |
2022 |
SHINWA EXPANSION PROJECT MAIN BUILDING |
300,000,000.00 |
| 10 |
PT. ADARO INDONESIA |
2022 |
REHABILITATION OF EXISTING CONVEYOR K1-CV-S03 DAN ASSESSMENT OF EXISTING CONVEYOR K3-CV-S07 |
119,677,015,540.00 |
| 11 |
PT. BINTANG EKA SERVISTAMA |
2022 |
JGC KULON PROGO - PEK. SANDBLASTING DAN FINISH PAINTING |
135,048,000.00 |
| 12 |
PT. BINTANG EKA SERVISTAMA |
2022 |
FABRIKASI SHINWA PHASE 2 - JASA FABRIKASI |
422,173,108.00 |
| 13 |
PT. BUMI SUKSESINDO |
2022 |
MINI SOCCER FIELD CONSTRUCTION |
2,076,029,708.00 |
| 14 |
PT. BUMI SUKSESINDO |
2022 |
ADDITIONAL WORK MINI SOCCER FIELD CONSTRUCTION |
566,960,178.00 |
| 15 |
PT. SARANA MULTI TALENTA |
2022 |
PEK. UNLOADING MUATAN LCT (JETTY NORTH KELANIS) |
167,762,500.00 |
| 16 |
PT. PETROSEA TBK |
2022 |
FABRICATION STEEL STRUCTURE - FLY OVER BRIDGE AWAK MAS |
21,362,100,000.00 |
| 17 |
PT. COMETA CAN |
2021 |
PROYEK PEMBANGUNAN GUDANG KALENG - KEJAYAN PASURUAN |
8,260,250,000.00 |
| 18 |
PT. KUMALA KIRANA INDUSTRI |
2021 |
FABRIKASI PLATFORM OFFICE |
135,000,000.00 |
| 19 |
PT. FLSMIDTH INDONESIA |
2021 |
C3 CONNECTION BOX |
520,000,000.00 |
| 20 |
PT. ALAM LESTARI UNGGUL |
2021 |
RUNWAY ALU NGORO |
150,000,000.00 |
| 21 |
PT. REKAYASA INDUSTRI |
2021 |
SUPPLY & FABRICATION OF STEEL STRUCTURE PACKAGE-5 (AREA 580, 590, 750 & MISC. STRUCTURE) - GAS DEVELOPMENT PROJECT FOR THE UNITIZATION OF THE JEMBARAN TIUNG BIRU FIELD (JTB) BOJONEGORO |
15,319,000,000.00 |
| 22 |
PT. REKAYASA INDUSTRI |
2021 |
ADDITIONAL WORK AND INSTALL LOCAL FOUNDATION EPC PEMBANGUNAN LIMA TANGKI UNIT PRODUK TPPI TUBAN |
2,564,300,000.00 |
| 23 |
PT. KUMALA KIRANA INDUSTRI |
2020 |
PEKERJAAN PENAMBAHAN BANGUNAN PABRIK BOARD |
3,190,000,000.00 |
| 24 |
PT. ALAM LESTARI UNGGUL |
2020 |
PROYEK PEMBANGUNAN KANTOR DAN GUDANG - BANJARMASIN |
5,265,400,000.00 |
| 25 |
PT. SCHLUMBERGER GEOPHYSICS NUSANTARA |
2020 |
MANGGAR INTEGRATED BASE - CAMERON WAREHOUSE EXTENSION |
12,760,000,000.00 |
| 26 |
PT. PROFILIA INDOTECH |
2020 |
PEMBANGUNAN PAGAR PANEL DAN JEMBATAN |
4,271,936,000.00 |
| 27 |
PT. ALAM LESTARI UNGGUL |
2020 |
PEMBANGUNAN GUDANG KOPI - BALI |
1,811,000,000.00 |
| 28 |
PT. TIMOR KARYA JAYA |
2020 |
PEMBANGUNAN WORLD BANK DILI - TIMOR LESTE |
1,169,000,000.00 |
| 29 |
PT. REKAYASA INDUSTRI |
2020 |
MECHANICAL WORK PACKAGE-2 - LOMBOK CFSPP FTP-2 (2 X 50 MW) PROJECT |
18,300,000,000.00 |
| 30 |
PT. WILMAR NABATI INDONESIA |
2020 |
PEKERJAAN MAIN BUILDING DAN SILO SOYA SORTING |
27,500,000,000.00 |
| 31 |
PT. WILMAR NABATI INDONESIA |
2020 |
PEKERJAAN FABRIKASI & INSTALL STRUCTURE WAREHOUSE 30 X 124 M |
8,200,000,000.00 |
| 32 |
PT. Wilmar Nabati Indonesia |
2020 |
PEKERJAAN PONDASI TANKFARM DAN STRUKTUR OLEIC ACID |
18,000,000,000.00 |
| 33 |
PT. GLOBAL AMINES INDONESIA |
2020 |
PEKERJAAN CIVIL, FOUNDATION WORK AND STRUCTURE FABRICATION AND INSTALLATION OF ISBL PROCESS AREA OF TERTIARY AMINES PLANT |
9,748,000,000.00 |
| 34 |
PT. REKAYASA INDUSTRI |
2020 |
FABRICATION & ERECTION ON NON BOILER #2 STEEL STRUCTURE - LOMBOK CFSPP FTP-2 (2x50 MW) PROJECT |
28,000,000,000.00 |